Extraction.... the Tech D homestead is producing natural gas.....
A natural gas well is tapped to produce fuel for the tractor, heating the home and out buildings and cooking meals. The gas well equipment, pumps, vacuums, refining, and pressure bottling is occupies one laborer (1 (laborer) x 5 (output) x 500 (material conversion factor)= 2500 and occupies 125,000M2 ((2500x100)/0.5=125000) This produces 2500kg of gas or 2500*35.3= 8825 cubic meters of natural gas.
8825 cubic meters of gas for one labor year.
To build the well took 1 (laborer)*6 (output) = 6 labor years (6*2000=12,000hrs) to get started and 1(laborer)*3(input)= 3 labor years (3*2000=6000 hours) annually in upkeep.
Last edited by ArmySGT.; 01-15-2016 at 09:53 PM.
|