View Single Post
  #45  
Old 09-15-2017, 12:31 AM
RN7 RN7 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,284
Default

Quote:
Originally Posted by Olefin View Post
We did the assembly of the MATV - half of them were built by us - i.e. 100% of the cabs were made by JLG and half the MATV's that were made by Oskhosk were fully assembled by JLG at a rate of 500 per month
Olefin what part of the M-ATV was built by BAE or by JLG?

We know that Caterpillar supplied the C7 engine, Allison supplied the 3500 transmission, Marmon Herrington supplied the axle, and Oshkosh supplied the TAK-4 independent suspension system. What did BAE and JLG build by itself or was it all supplied by Oshkosh?

Also were these individual components fitted to a vehicle body when BAE and JLG received them, or were they shipped to BAE and JLG separately and assembled on the vehicle afterwards?

Was the cab an Oshkosh Core1080 crew protection system? Did BAE or JLG make it or did they assemble it in parts? Also did BAE or JLG actually make the armor plates and the ballistic glass or was it shipped to BAE and JLG. If so did BAE or JLG get a license from Plasan the Israeli company who designed the armor kit for the M-ATV and built it in their factory in Bennington Vermont?
Reply With Quote