View Single Post
  #52  
Old 09-18-2017, 10:27 PM
Olefin Olefin is offline
Banned
 
Join Date: Mar 2012
Location: Greencastle, PA
Posts: 3,003
Default

Quote:
Originally Posted by RN7 View Post
So most of the components including the engine block, transmission, axles and suspension and the other parts were already fully built by Oshkosh and the other suppliers and then shipped to you where you assembled them. Then you assembled the cab and some fittings with the armour and completed the vehicle.

This is exactly what a custom builder would do, although in some cases they also modify the vehicle and fit their own equipment. And this is the point that I am trying to make about JLG. JLG is a custom builder, although I am not implying that BAE at York is also a custom builder.

The fact that JLG assembled a relatively large number of vehicles, certainly more than a custom builder would normally build, is to do with the fact that it was doing so on behalf Oshkosh who funded it. Oshkosh and its main suppliers already built the main components at their own factories and then shipped them to JLG and BAE for assembly. Obviously Oshkosh hadn't got the space at their own production lines to assemble and fit out the M-ATV without a major investment of their existing facilities, so they used JLG (which they bought) and also contracted BAE to do this.
RN7 - you are describing a knock down plant - that is not what JLG did - we built ALL the cabs for the M-ATV that Oshkosh contracted for to the US Govt - i.e. 100% of them - and then we finished the assembly of half of them and sent the other half of the cabs to Oshkosh for them to fully assembly - in other words we assembled the cab and then fitted it out with the engine, transmission, interior, electronics, etc. and built half the M-ATV's that were built by Oshkosh - over 4000 of them

and BAE built their own MRAP's all on their own - they arent part of Oshkosh
Reply With Quote