View Single Post
  #40  
Old 09-14-2017, 12:20 PM
Olefin Olefin is offline
Banned
 
Join Date: Mar 2012
Location: Greencastle, PA
Posts: 3,003
Default

Description of the JLG work

The work has been split between Oshkosh Defense plants in Wisconsin and JLG’s McConnellsburg plant, with JLG making 100 percent of the MATV cabs and completing 50 percent of the M-ATV assemblies. The remaining half of the assemblies are completed by Oshkosh Defense. This combined effort has produced 1,000 M-ATVs per month since December.

JLG built the cabs and completed the assembly of the vehicle - the engines came from Caterpillar, the chassis came from the Medium Tactical Vehicle Replacement (MTVR) chassis that Oshkosh designed and Oshkosh's TAK-4 suspension system and the transmission came from Allison

Which is standard for vehicles - i.e. Oshkosh's assembly plant doesnt build their own engines or transmissions they bring them in and install them just like we did - same for BAE - we didnt build engines or transmissions
Reply With Quote