#11
|
|||
|
|||
I've been thinking about how an aircraft would be converted to fusion based.
Taking the MD500/MD530 series of helicopter, the engine is an Allison/Rolls-Royce Model 250-C20B or C20R Turbo Shaft Engine. To keep the helicopter in balance the fusion source should not exceed the following specs (C20R Replacement); Overall Length: 1038 mm Overall Width: 527 mm Overall Height: 589 mm Total Weight: 78.5 kg Everything else should stay the same as originally installed. Something this size, it wouldn't be out of character to have a limited operating timeframe, say 3 to 6 months, before the engine has to be pulled and then refurbished (this would nicely simulate a real world maintenance cycle for the gas counterpart). Anything that is converted to fusion should be a 1 for 1 swap, if the airframe has 4 engines then 4 fusion engines are changed that are similar in details. |
Currently Active Users Viewing This Thread: 3 (0 members and 3 guests) | |
|
|