View Single Post
  #35  
Old 04-24-2012, 10:07 PM
James1978 James1978 is offline
Registered User
 
Join Date: Jul 2009
Posts: 59
Default USS Saratoga CV-60

The Saratoga went into the Philadelphia Naval Shipyard in 1980 for a SLEP overhaul that lasted 28 months. Material-wise, she wasn't the same ship after the SLEP that she was in 1978.
Reply With Quote