I know several combat engineers who ran D-7 dozers and doing five miles of earth berm not a problem talking with them not even that long to do week or two. In my first deployment to Iraq in 03 we showed up and were told that this plot of land was going to be our base camp for the next little bit, our engineers had dozers and SEE trucks, with in two days we had all the trees, weeds and such dozed down had a berm around the “base” and by weeks end had wire up around as well.
|