I've been thinking about how an aircraft would be converted to fusion based.
Taking the MD500/MD530 series of helicopter, the engine is an Allison/Rolls-Royce Model 250-C20B or C20R Turbo Shaft Engine.
To keep the helicopter in balance the fusion source should not exceed the following specs (C20R Replacement);
Overall Length: 1038 mm
Overall Width: 527 mm
Overall Height: 589 mm
Total Weight: 78.5 kg
Everything else should stay the same as originally installed.
Something this size, it wouldn't be out of character to have a limited operating timeframe, say 3 to 6 months, before the engine has to be pulled and then refurbished (this would nicely simulate a real world maintenance cycle for the gas counterpart).
Anything that is converted to fusion should be a 1 for 1 swap, if the airframe has 4 engines then 4 fusion engines are changed that are similar in details.
|