
06-09-2016, 04:55 PM
|
 |
Internet Intellectual
|
|
Join Date: Jun 2011
Location: Colorado
Posts: 2,412
|
|
Quote:
Originally Posted by dragoon500ly
I see that, but wouldn't soil, grass, brush be piled/placed over the top of the bolt hole? Even with the planned five years, you going to run into packed earth, roots etc.. There would still be a need for some digging/cutting at least for the final foot or two. With 150 years of plant, debris and whatever else comes to rest, I can see manor excavation work just to get a hatch open.
|
Or a few feet of volcanic ash...... oops...... that's Final Watch.
|