Thread: Project Bases
View Single Post
  #27  
Old 06-28-2017, 10:16 AM
kalos72's Avatar
kalos72 kalos72 is offline
Registered User
 
Join Date: Feb 2009
Location: Jacksonville Florida
Posts: 921
Default

Quote:
Originally Posted by dragoon500ly View Post
I typically assign a Recon Team a primary operational area of 200kms. They will often have a secondary operational area of about 500kms from their bolt-hole. I want the recon teams to be out and about.

MARS Teams are typically responsible for a 400km area.

Science Teams run about 1,200km area.

Thanks for the detail dragoon.

Let's take Arkansas as an example, at 137000 square KMS.
685 Recon Teams@ 6 per team=4110 Recon Members
342 MARS Teams@10 per team-3420 MARS Members
114 Science Teams@10 per team = 1140 Science members

Is that the sort of breakdown you see?
__________________
"Oh yes, I WOOT!"
TheDarkProphet
Reply With Quote