Quote:
Originally Posted by Ursus Maior
That would be possible. Skimming off one year from a five year building period or a two year outfitting period is a major change though. It could influence her capabilities, making her shakedown cruise in the Baltic Sea even more off a reckless idea by the president.
|
Valid points. But I was thinking more along the lines that she was laid down earlier- so building began a year or two before it did IRL- as opposed to cutting corners to put it out to sea faster.
@All: The USS Truman thing is kind of a dead horse at this point. As GMs, we have options.
1. Keep it as-is.
2. Modify or change it (to an amphib Harrier carrier, a battleship, or something else).
3. Ignore it completely.
And if it really, really bothers you, contact FL directly and let them know.
It's probably best to let the topic die and move on to discuss other aspects of v4.
-