Wherever there are any changes in gradient that would otherwise prevent the trains continuing under horse/oxen power, install a station with cables. Build a winding house adjacent to the tracks, and run the winch off of either steam or alcohol power. The carriages can be hauled up or lowered by winch and the livestock moved either by trail alongside or even given a ride on special wagons.
|