Looking over the fas.org stuff you linked, very nice!
So we basically have two options, a single trailer unit towed by a 5-ton tractor or a series of pods fitted to the back of a Hummer(s) or towed as a trailer. Either one works, depending on the time period you set your Project in. I can even see the 5-ton unit being updated as newer tech shows up.
As for the deployment. I can see these units with a National/Regional Engineer Team without a problem. As for the State/Group Engineer Teams, they would more likely tow a trailer with a pod installed.
OR...
This could be a logical item of equipment for the so-called Repair Teams that get the occasional mention. Its hinted that they are the ones to strip the used boltholes of salvageable equipment. Or would they be a Regional asset that conducts major repairs for damaged Project equipment and any necessary repairs to major items such as generators?
__________________
The reason that the American Army does so well in wartime, is that war is chaos, and the American Army practices chaos on a daily basis.
|