Thread: Prime Base
View Single Post
  #119  
Old 12-21-2015, 11:34 AM
ArmySGT.'s Avatar
ArmySGT. ArmySGT. is offline
Internet Intellectual
 
Join Date: Jun 2011
Location: Colorado
Posts: 2,412
Default

I am in a divided camp.

I think signals security was rigidly enforced from the start of the war, through the listening and recording phase, and into the first stage (recon teams) activation.

However, I think that with the intended activation of the bulk of the Project, Regional Bases and Combined Groups, the deception would be dropped.

After all, a 4000 foot runway for cargo aircraft was intended.
Reply With Quote