Quote:
Originally Posted by .45cultist
Using TLA, one gets 5 tons of ore from a mine, 10 tons otherwise as a base per man hour.Smelter does 10,000 tons per day as a base number.
|
Sorry, I missed the 4th ed. request and I was building on the fly.
I'll give it a read..... but, like the rest of the econ; I don't have much hope for a clear answer.