View Single Post
  #7  
Old 11-17-2015, 04:52 PM
ArmySGT.'s Avatar
ArmySGT. ArmySGT. is offline
Internet Intellectual
 
Join Date: Jun 2011
Location: Colorado
Posts: 2,412
Default

Quote:
Originally Posted by .45cultist View Post
Using TLA, one gets 5 tons of ore from a mine, 10 tons otherwise as a base per man hour.Smelter does 10,000 tons per day as a base number.
Sorry, I missed the 4th ed. request and I was building on the fly.

I'll give it a read..... but, like the rest of the econ; I don't have much hope for a clear answer.
Reply With Quote