View Single Post
  #25  
Old 09-26-2010, 10:42 AM
Blakrider Blakrider is offline
Registered User
 
Join Date: Aug 2009
Location: Perth AU
Posts: 11
Default

you made some good points legbreaker about the USS Cabot, but I could simply say that an other organisation bought her in 92 and moved her to Mobile, AL and began making repairs and preping her to be a Museum ship next to the USS Alabama. when things started side into that bucket, the navy may just think to here her like Chico did the remaining Essex class Carriers and bring it back into service.

and as to possible cost of reactivating the Attack Transport USS Gage, the haskell class is really nothing more then a WW2 era Victory Frieghter that has been converted to a attack ship. and a large number of them were still part of the reserve fleet in the mid to late 90s.

In the 1997 a survey was done to evaluate the cost of refit and reactivation of the ships to active duty. total cost estimated $2. Million, almost the same cost of building them in the first place, ($2,500,000, but adjusting for inflation her construction coasts would have been a estimated $40 Million. if they had gone ahead it would made the US Military less reliant on forgien shipping. ( of course the politicians stopped it, made to much sence)
Reply With Quote