|
#1
|
|||
|
|||
Look at what I saw this week M8 AGS
I was down at Benning this week and was able to get my picture next to one of the old M8 AGS that BAE had on display.
|
#2
|
||||
|
||||
Would be nice if there were a battalion of these supplementing the 82nd.
Edit. I am going to have to see if anyone has made a 6mm(1/285th) version of the M8. It always was a fav of mine. |
#3
|
|||
|
|||
Well the MPF requirement is for a Company per light Brigade, including the the Aiborne BCTs.
|
#4
|
||||
|
||||
I always wondered if the program would have been more successful with a universal turret. A turret that could be mounted to any hull with the right sized ring.
|
#5
|
|||
|
|||
Quote:
The AGS's problem was that it was in competition with other big programs in an era of Army down sizing (90's after the wall) and it fell victim to budget realities (kind of the same problem now....). The MGS the problem was two great defense giants that were competing for the interim armor vehicle (IAV) that would become the Stryker family of vehicles. The Army at THAT time wanted a common wheel set of vehicles. The AGS out performed all of the competition during the platform demonstration, but alas the Army was looking for one manufacture to big a family of vehicles (and those must have wheels). Now if we had Government rights to the turret design, then we might have been able to tell GDLS to use the AGS turret and auto loader. But alas that is not the way it works in acquisition in the real world. So we are stuck with what we have, that is no platform for the airborne and light guys to shoot quicker, faster, that is armored against arty/small arms fire and can fire on the move while the ATGM operators mainly stay static and are vulnerable to fire (both indirect and direct). |
#6
|
||||
|
||||
Quote:
I hope the changes wrought by SecDef Rumsfeld that allowed companies to solicit directly (as they used to before McNamara) to the Department of Defense have continued. Bringing their new systems or refinements directly without the long, long, (often conflicting) request for proposal process. Still, I think a universal turret program based on a universal turret ring size would be a giant and productive leap forward. |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|