RPG Forums

Go Back   RPG Forums > Role Playing Game Section > Morrow Project/ Project Phoenix Forum

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 07-18-2014, 06:00 PM
ArmySGT.'s Avatar
ArmySGT. ArmySGT. is offline
Internet Intellectual
 
Join Date: Jun 2011
Location: Colorado
Posts: 2,412
Default Wake up sequence.

In your best Hollywood big action summer block buster style! What is your wake up sequence?

This is a Department of Defense Team sequence. I am writing up as an alternative to MP or Snake Eaters.

Query Status check.
Time since last Query
153 years, 47 days.
Status Check. Begin.
Batteries 98% normal
Thermocouple (nuclear) 85% request check
Water purification systems 10% request check
Air filtration system 99% inactive
Pressure seals 99%
Door power systems 99%
Environmental humidity 01%
Nitrogen/Argon atmosphere 99%
Communications systems 99%
Capsule one 99%
Occupant capsule one stable
Capsule two 99%
Occupant capsule two stable
Capsule three 99%
Occupant capsule three stable
Capsule four 99%
Occupant capsule four stable
Capsule five 99%
Occupant capsule five stable
Capsule six 96% request check
Occupant capsule six stable
Capsule seven (K9) 12%
Occupant capsule seven – lost
System require significant intervention.
Request maintenance support.
Capsule seven auto disconnect from activation sequence.
Auto request for external maintenance support initiated.
Signal National Command Authority- No signal
Signal Site R – No signal
Signal North American Air Defense – No signal
Signal Strategic Air Command- No signal
Signal US Navy Atlantic Fleet Command – No signal
Signal National Emergency Airborne Command Post – No Signal
Signal Defense Switched Network – Signal 100%
Query Defense Switch Network – Signal – Reply negative
Query Defense Switch Network – Signal – Reply negative
Query Defense Switch Network – Signal – Communications established
External communications – commit- Protocol War Plan MAD 001
External communications – authorization codes received.
External communications – authorization codes Damocles invalid.
External communications- Abort.

External communications failed.
Systems Status check failed.
Emergency activation protocols initiated.
Advance systems to full active.
Environmental systems to purge.
Environmental systems reset.
Environmental systems to Nitrogen/Oxygen mix.
Activation of Cryosystems wakeup mode
Capsule one – Active
Capsule two – Active
Capsule three- Active
Capsule four – Active
Capsule five – Active
Capsule six – Abort
Capsule six – Abort
Capsule six – Reset for manual control
Capsule seven –Abort
Capsule seven – Abort
Capsule seven – Abort

Sequence complete.

Greetings, Team. Good Luck.
Reply With Quote
 


Currently Active Users Viewing This Thread: 3 (0 members and 3 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 06:45 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.