RPG Forums

Go Back   RPG Forums > Role Playing Game Section > Morrow Project/ Project Phoenix Forum
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 07-23-2014, 08:40 PM
mmartin798 mmartin798 is offline
Registered User
 
Join Date: Feb 2014
Location: Michigan
Posts: 667
Default Fusion Reactor Musings

I have again given some thought to the size, configuration and so on the MP Vehicle Reactor. Assuming it uses H2 for fuel and is only 25% efficient, the tank for the H2 would be about the size of a large scuba tank for 18 months of continuous output at 1.5MWH. I pick 1.5MW since I seem to recall that is about the output of an M1's gas turbine. Would the reactor casing encompass the fuel tank or would the tank be separate? If it were separate, refueling would be a non-trivial but easy operation.

Step 1) Power down reactor
Step 2) Close internal fuel valve
Step 3) Remove old tank
Step 4) Connect new tank
Step 5) Attach vacuum pump to supply line
Step 6) Evacuate air from supply line
Step 7) Open both internal and tank valves
Step 8) Restart reactor

This would allow for a top off in just a couple hours. This is also something that potentially could be cobbled together by a motivated team. Thoughts?
Reply With Quote
 


Currently Active Users Viewing This Thread: 2 (0 members and 2 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 06:00 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.