![]() |
![]() |
|
#1
|
|||
|
|||
![]() Quote:
|
#2
|
||||
|
||||
![]() Quote:
M116 Husky Prototype video BV 206 video |
#3
|
|||
|
|||
![]()
A nice special vehicle from certain depots for the teams.
|
#4
|
||||
|
||||
![]()
I am going to stick with the BV 206. It was adopted by many armed forces including the U.S. Army and Marine Corps. That means stats are available and pictures!
Also it would be recognized by U.S. and Canadian forces as a NATO vehicle. This reduces the chances of being fired upon. The M116 is a valid possibility. The MP does use vehicles that were not adopted or made in limited quantities. |
#5
|
||||
|
||||
![]()
Just had a wicked thought.
The Morrow Project fusion power plant is the key that Damocles has been waiting for, even better if the Team has a fusion pack in their possession too. Damocles could even send bots to retrieve one from a Team cache if he accesses the autonav. This unties Damocles drones from the Damocles facility itself. The MDUs, maintenance units, the recon units, and the IDUs are all battery powered. Damocles might just rebuild some units with fusion power plants, as soon as he can assemble a plant to make Helium 3 or other fusion fuel. The Damocles might be off to seek National Command Authority himself. To build links and re-establish connection to other DoD assets or DARPA funded research centers. Within a year, Damocles could be a "Skynet" level dangerous. Bots taking over the computer lab at the Chicago campus. Bots on the way to seize Houston. |
#6
|
||||
|
||||
![]() ![]() ![]() PURPOSE: Provide Infantry Platoon combat support in arctic, harsh terrain and mountainous regions (northern regions of Alaska/Europe). GENERAL INFORMATION Nomenclature: CARRIER, CARGO, TRACKED: 1 l/2-Ton, Small Unit Support Vehicle (SUSV) Model Number: M973 NSN: 2350-01-132-9099 LIN: C11280 SSN: D19001 TM: Commercial CHARACTERISTICS Engine: Daimler Benz-Model OM617A Type: Four stroke, 5 cyl Diesel Horsepower: 125 bhp @ 4,350 rpm Transmission: Daimler Benz Model W4A Type: Automatic Daimler Benz W4A-018 Ranges: Fwd 4, Rev 1 Electrical System: 24 Volt Brakes: Disc, All four tracks PERFORMANCE DATA Fording Depth: Floats Approach Angle: 34 Degrees Maximum Grade Ability: 31 Degrees Maximum Vertical Obstacle: 12 in Minimum Maximum Side Slope: 35 Degrees Allowable Speed: 31 mph Cruising Range: 200 miles Ground Pressure: 1.8 psi VEHICLE DATA Type Classification & Date: M973, 5 Nov, 1982 Life Expectancy: 15 Years Payload: 4,400 lb (2,000 kg) Air Transportability: Helicopter Delivery, Military Aircraft, C130 EQUIPMENT OPTIONS Armament: None Ammunition: None Communications: AN/VRC-46, -47, -48, -49 AN/GRC-160 Sighting & Fire Control: SHIPPING DATA Weight: 9,200 lb (4,200 kg) Cube: 1,080 cu ft Ground Clearance: 13.8 in (loaded) |
#7
|
||||
|
||||
![]()
Here is a thought.
Damocles. Damocles has been made aware of the Morrow Project activation codes (Operation Lucifer assumes a successful Operation Damocles). Damocles is a DoD asset (aka a U.S. Government one) and presumably able to access the confidential files of the "Snake Eater" program. What if Damocles begins the whole scale activation of the SOF teams? Damocles is essentially held hostage by the Morrow Project, so wouldn't he activate the assets meant to control or eliminate the Morrow Project? |
![]() |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | Search this Thread |
Display Modes | |
|
|