Quote:
Originally Posted by ArmySGT. View Post
If the power unit only has one axle, how do you dismount one from a work section and connect a different work section? I.e remove the dump truck and add the scraper?
In the image below I was thinking the circle might be some sort of retractable wheel. If so that would really slow the transfer process unless the transposed units are right next to each other.
Attached Images
 
Reply With Quote
  #2  
Old 10-25-2013, 02:48 PM
ArmySGT.'s Avatar
ArmySGT. ArmySGT. is offline
Internet Intellectual
 
Join Date: Jun 2011
Location: Colorado
Posts: 2,412
Default

Quote:
Originally Posted by kato13 View Post
In the image below I was thinking the circle might be some sort of retractable wheel. If so that would really slow the transfer process unless the transposed units are right next to each other.
It is one thing if you can swap out power units for repair or maintenance and this takes a two hours. It is entirely different if it takes two hours to swap work sections to continue working on an assigned task.

The four wheel power module looks like the smarter approach and one that can be exchanged quickly on the job site.
Reply With Quote
  #3  
Old 10-25-2013, 02:55 PM
kato13's Avatar
kato13 kato13 is offline
Administrator
 
Join Date: May 2007
Location: Chicago, Il USA
Posts: 3,657
Send a message via ICQ to kato13
Default

Quote:
Originally Posted by ArmySGT. View Post
It is one thing if you can swap out power units for repair or maintenance and this takes a two hours. It is entirely different if it takes two hours to swap work sections to continue working on an assigned task.

The four wheel power module looks like the smarter approach and one that can be exchanged quickly on the job site.
I fully agree. I realized I had said i liked the two wheel version when I meant to type the two axle version (The Lockheed design).
Reply With Quote
  #4  
Old 10-25-2013, 03:19 PM
Gelrir Gelrir is offline
Registered User
 
Join Date: Nov 2010
Posts: 226
Default

Congrats, Kato, you win today's internet for finding a FAMECE picture!

The original requirement by the Army was to swap modules in 30 minutes; I dunno how well Clark or Lockheed did in that regard.

The single-axle power module probably has an advantage in weight -- those big tires and wheels are very heavy. Meeting the 15,000 pound weight limit for each module was probably not easy. An eensie-wheensie "trailer wheel" for moving the power module around when swapping, or into aircraft, etc. makes sense for that.

One can presume, of course, that Lockheed Corp. was part of the Council of Tomorrow -- along with all of its bankruptcy and bribery problems. Given that they build the C-130, that might fit in with the "electric C-130" concept for Prime Base.

--
Michael B.
Reply With Quote
  #5  
Old 10-25-2013, 03:28 PM
Gelrir Gelrir is offline
Registered User
 
Join Date: Nov 2010
Posts: 226
Default

I found a sketch of the Clark FAMECE equipment in a discussion of the compactor; it clearly shows a small wheel, which seems to be lowered from the side of the power module. So, I guess it's not a tricycle!

--
Michael B.
Attached Images
 
Reply With Quote
  #6  
Old 10-25-2013, 03:29 PM
Gelrir Gelrir is offline
Registered User
 
Join Date: Nov 2010
Posts: 226
Default

Oh, and a bit more from an article in the News-Palladium for March of 1974:

"In order to accommodate the various attachments, the cockpit of Clark's power module prototype rotates 180 degrees, permitting it to be used as a push or pull vehicle. Constructed as a single axle power module, it uses hydraulically operated auxiliary wheels to operate independently when not attached to the grader or scraper module. ' Designed to be quickly assembled, the grader and scraper modules are structurally married or detached from the power module by four bolts."

--
Michael B.
Reply With Quote
  #7  
Old 10-25-2013, 03:35 PM
Gelrir Gelrir is offline
Registered User
 
Join Date: Nov 2010
Posts: 226
Default

Some nice drawings of the Clark equipment, and a few more numbers, in this PDF of a 1980 document:

http://www.google.com/url?sa=t&rct=j...mdXb9EQJQ3tHEg

--
Michael B.
Reply With Quote
  #8  
Old 10-25-2013, 03:52 PM
kato13's Avatar
kato13 kato13 is offline
Administrator
 
Join Date: May 2007
Location: Chicago, Il USA
Posts: 3,657
Send a message via ICQ to kato13
Default

Quote:
Originally Posted by Gelrir View Post
One can presume, of course, that Lockheed Corp. was part of the Council of Tomorrow -- along with all of its bankruptcy and bribery problems. Given that they build the C-130, that might fit in with the "electric C-130" concept for Prime Base.
In general i like to Project companies to be private if possible. I certainly see them partnering with Lockheed on projects or maybe licensing designs. Lockheed, given its size, would have attracted all sorts of attention (congress, DOD, SEC, IRS GAO). Clark seems like it could have been privately acquired and capable of avoiding some of that scrutiny.
Reply With Quote
  #9  
Old 10-25-2013, 03:57 PM
kato13's Avatar
kato13 kato13 is offline
Administrator
 
Join Date: May 2007
Location: Chicago, Il USA
Posts: 3,657
Send a message via ICQ to kato13
Default

Looked at the PDFs. Nice finds Gelrir.
Reply With Quote
  #10  
Old 11-10-2013, 12:11 AM
Gelrir Gelrir is offline
Registered User
 
Join Date: Nov 2010
Posts: 226
Default

I've got a copy of "Jane's Combat Support Equipment 1978-79", and on page 231-232 they've got a writeup of the FAMECE program. Nothing we haven't already seen in this thread, really, except some minor points:

Quote:
"Assembled, combinations will be able to travel over rough terrain up to 48 kh/h"
Quote:
"The fiscal year 1979 request was for 376 units of FAMECE at a cost of $24 million."
Along with a very "Popular Mechanics"-y illustration of half-a-dozen FAMECE units doing things. Probably depicts an early version of the Clark system: the power units have only two big wheels, but don't have the roll-over protection cabs.

--
Michael B.

P.S. -- if anyone needs stats on 'combat support' stuff for the classic MP setting, let me know and I can peek in this book. It's got the XR311, the V150 armored recovery vehicle, and thousands of other items detailed.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 11:22 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.