RPG Forums

Go Back   RPG Forums > Campaign Forums > natehale1971's Campaign(s) > NH1971 - "Morrow Project" Campaign
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 11-21-2010, 10:40 PM
natehale1971's Avatar
natehale1971 natehale1971 is offline
Registered User
 
Join Date: May 2009
Location: Monroe, NC, USA
Posts: 1,199
Send a message via AIM to natehale1971 Send a message via MSN to natehale1971 Send a message via Yahoo to natehale1971
Default

Morrow Project Engineering & Construction Team MI-EC-xx will be extremely busy for the next several years building all of the Morrow Project facilities that will be needed by Combined Operations Group Upper Peninsula. Engineering & Construction Team MI-EC-xx was placed in hiberation in a facility with their equipment and enough supplies to start construction basic necessary projects that the Combined Oeperations Group Command Team would deem a priority. Shortly after being awoken, MI-EC-xx will be assigned to assist MI-AV-xx in the construction of a fully operational airfield somewhere close by Medical Facility MI-HM-09.
Assigned: Morrow Project Engineering & Construction Team MI-EC-xx
Team Members (24):
De La Croix (Team Leader),
Sosna (Deputy Team Leader),
Chinich (Team Communications Specialist),
Fosley (Team Medical Specialist),
Weiss (Assistant Team Medical Specialist),
Butler (General Construction Supervisor),
Matlock (General Construction Specialist),
Rozic (General Construction Specialist),
Ring (General Construction Specialist),
Farella (General Construction Specialist),
Avery (Heavy Construction Equipment Operation Supervisor),
Katz (Heavy Construction Equipment Operation Specialsit),
Telfer (Heavy Construction Equipment Operation Specialsit),
Brillstein (General Construction Equipment Operations Supervisor),
Lloyd (General Construction Equipment Operations Specialist),
McCarthy (General Construction Equipment Operations Specialist),
Walker (Topographic Survey Supervisor),
Espinoza (Topographic Survey Specialist),
Swartz (Topographic Survey Specialist),
Garner (Topographic Engineering Specialist),
Walsh (Carpentry & Masonary Specialist),
Patzik (Engineering Specialist),
Engelhardt (Equipment Operations Specialist),
Goodman (Equipment Maintenance Specialist),
Team Vehicles (9): Cadillac Gage Commando Ranger 4x4 APC (3), Ford Motor Company XR-311 4x4 Combat Support Vehicle (6)
__________________
Fuck being a hero. Do you know what you get for being a hero? Nothing! You get shot at. You get a little pat on the back, blah blah blah, attaboy! You get divorced... Your wife can't remember your last name, your kids don't want to talk to you... You get to eat a lot of meals by yourself. Trust me kid, nobody wants to be that guy. I do this because there is nobody else to do it right now. Believe me if there was somebody else to do it, I would let them do it. There's not, so I'm doing it.
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 07:03 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.